问题:单选题When doing capacity planning for the Virtual I/O Server,what is the most important consideration?()A The I/O workload needs of the client LPARsB The processing requirements of the client LPARsC The memory requirements of the client LPARsD The virtual ...
查看答案
问题:单选题ompany.com has recently received a new p5-570 in the data center and wants to connect it to an existing HMC environment where each of the existing POWER5 servers has been assigned a static IP address. Which of the following actions should the technical...
问题:单选题What is the correct sequence to set up a Virtual I/O Server?() 1.Boot to SMS 2.Create the VIOS partition 3.Install VIOS software 4.Accept licenseA 4, 2, 1, 3B 2, 1, 4, 3C 2, 1, 3, 4D 1, 2, 3, 4...
问题:单选题A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2. Which of the following virtualization technologies can be used?()A DLPARB Micro-PartitioningC Virtual StorageD Virtual Ethernet...
问题:单选题A technical specialist defined a virtual Ethernet ent2 on the VIO server that has a physical adapter, ent0. Which of the following commands should be used to configure the Shared Ethernet Adapter?()A mkvdev -sea ent2 -vadapter ent0 -default ent0 -def...
问题:单选题Company.com wants to build two Dynamic Logical Partitions (DLPAR) on a p5-520. They have a requirement for communication between the two DLPARs. Which feature of virtualization will satisfy this requirement?()A VLANB Virtual EthernetC Virtual I/O Serve...
问题:单选题Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool....
问题:单选题Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()A HMC command l...
问题:单选题Which of the following commands is used to restore the VIO server from a backup image?()A ddB tarC restoreD installios...
问题:单选题Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose?()A p5-520 running Virtual I/O ServerB p690 running AIX 5L V5.3C p5-510 ru...
问题:单选题A hosting company recently purchased an IBM p5-570 to use in their data center. The company intends to use the server to run several different client workloads. Which of the following features of the IBM p5 servers addresses the need for the isolation ...
问题:单选题Company.com wants to reassign a host bus adapter (HBA) from one partition to another to handle increased I/O workload on that partition. What needs to be done to dynamically move the card?()A Use the rmdev command to remove the card from the current p...
问题:单选题Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()A Two HBAs assigned to each redundant VIOS which provides VSCSI access...
问题:单选题Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the to...
问题:单选题ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web...
问题:单选题A client partition has the rootvg disks mapped from two separate VIO servers. They are using AIX mirroring to provide redundancy on rootvg. One of the VIO servers was taken down for maintenance and is now back on-line. The client partitions now show Ph...
问题:单选题Which of the following allows the user to have two separate Ethernet networks share the same network adapter?()A VLAN tagsB EtherChannelC Virtual EthernetD Shared Ethernet Adapter...
问题:单选题A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concer...
问题:单选题Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()A Remove the physical Ethernet adapters from the LPARsB Activate Advanced POWER Vi...