AIX V5.2
AIX V4.2
AIX V4.3
AIX V5.1
单选题A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()A A p650 running AIX v5.3B A p5-550 running AIX v5.3C A p5-570 running Advanced POWER VirtualizationD Multiple rack-mounted p615s running dynamic LPAR
点击查看答案
单选题A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems. They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems. They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()A Combine the file/print servers onto a larger Intel-based machine (x445).B Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.C Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.D Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.
单选题A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()A p5 hardware, AIX 5.2, Virtual I/O ServerB POWER4 hardware, AIX 5.3, Virtual I/O Server,C p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
单选题Which of the following lists of items all require an HMC to function with POWER5?()A Running AIX 5.3 Implementing HACMP Implementing Static LPARB Implementing Advanced POWER Virtualization Running Linux Attaching RIO drawersC Implementing VIO Server Implementing Dynamic LPAR Running with SMT turned OnD Running AIX and Linux on the same system Implementing CoD Implementing Micro-Partitioning
单选题Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()A Assign the adapter to an IO Hosting partitionB Use AIX 5L affinity to move the application from SUSE to AIXC Use AIX 5.3 drivers to install the adapter in the Linux LPARD Assign the adapter to an AIX 5.3 partition running Linux Affinity
单选题Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()A Remove the physical Ethernet adapters from the LPARsB Activate Advanced POWER VirtualizationC Update microcode for the virtual adaptersD Upgrade AIX V5.2 LPAR to AIX V5.3
单选题Which of the following versions of AIX provide both multi-path I/O and dynamic LPAR?()A AIX V5.2B AIX V4.2C AIX V4.3D AIX V5.1