问题:单选题Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()A From the HMCB From a NFS mountC From a FTP serverD From any CD or DVD drive on another server...
查看答案
问题:单选题Which Virtual IO Server function allows disk to be shared by multiple LPARs?()A Virtual LANB Virtual diskC Virtual SCSID Virtual serial...
问题:单选题After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()A The cf...
问题:单选题A system administrator had a disk failure on an HMC. The disk was replaced and the HMC was loaded from the Product Recovery CD. The system administrator had performed a backup to DVD of the HMC data before the system failed. After restoring the backup ...
问题:单选题A p5 570 12 way was purchased with the plan to install six LPARs running AIX 5.2. The machine has 12 disks spread evenly over the internal server drawers. The customer would now like to add a seventh LPAR. Which of the following should be added for the...
问题:单选题Companycom needs to run a 32 bit kernel under AIX 5.3. What steps need to be done to accomplish this with the least disruption since the system is already installed with a 64 bit kernel?()A Reload the operating system and select 32 bit kernel on initia...
问题:单选题Companycom has restored their mksysb. They notice that the external volume groups cannot be seen. What should be done to access the volume groups?()A Run importvg commandB Run synclvodm commandC Recreate volume groupsD Update /etc/filesystems...
问题:单选题What type of configuration can provide the best availability in a Virtual IO Server environment?()A Provide multiple paths to all resources through 2 or more Virtual IO ServersB Mirror all disk resources on the Virtual IO Server to present to the clien...
问题:单选题With a scalable volume group, where is the logical volume control information stored on the disk?()A In the ODMB In the volume group descriptor areaC In the first 512 bytes of the logical deviceD In the first block of the user data within the LV...
问题:单选题Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are ...
问题:单选题When configuring Micro-Partitioning into shared processor partitions, what limitations should be considered?()A Shared processors never affect AIX 5L affinity management.B Shared processors can only be implemented with AIX and not with Linux or i5OS.C ...
问题:单选题What is a primary differentiator between pSeries eWLM (Enterprise Workload Manager) and WLM (Workload Manager)?()A pSeries eWLM can create classes while pSeries WLM can create tiers.B pSeries eWLM can create tiers while pSeries WLM can create classes.C...
问题:单选题Companycom has several AS/400 servers in their IT infrastructure running V5R2 that they wish to consolidate. The customer wants to simplify their environment and install i5/OS on a p5 590 with 16 1.65GHz processors and 20 i5/OS partitions. The customer...
问题:单选题Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()A The server must be installed into a loc...
问题:单选题A client will be creating partitions on multiple systems with identical configurations. What is the recommended method for cloning the master partition?()A Create a mksysb backup of the original and restore it to the new partitionsB Use NIM to load the...
问题:单选题Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required ...
问题:单选题Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()A Verify the ISV application runs on AIX 5.2B Power4 to POWER5 upgra...
问题:单选题The HMC software has just been upgraded remotely via the WebSM client. It now needs to be rebooted to make the update active. How can this be accomplished?()A Use ssh to connect to the HMC and rebootB The upgrade will display complete and ask you to re...
问题:单选题Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A VIO ServerB AIX 5.2 ML4C Shared Ethernet AdapterD AIX 5.3 with Advanced Power Virt...